Meyer Blue Completion Dates in Brief
The developer of Meyer Blue expects to give notice of vacant possession by 31 December 2028 and to reach legal completion by 31 December 2031. Those are the expected dates in the developer’s particulars; the dates that bind a particular home are the ones in its sale and purchase agreement.
The tower is under construction, and its homes are sold on the progressive payment scheme. After the booking fee and the instalment at the sale and purchase agreement, each instalment follows a certified stage of the works rather than a fixed calendar date, and the last two fall due at the Temporary Occupation Permit and at the Certificate of Statutory Completion.
How Meyer Blue Got Here
The site was the freehold Meyer Park at 81 and 83 Meyer Road, which UOL and Singapore Land Group acquired en bloc in February 2023, as EdgeProp reported. The building plans were approved on 13 August 2024, the date carried on the developer’s site plan, and the developer issued its factsheet on 2 September 2024 with the unit mix of 226 homes, together with the e-brochure.
Private previews opened on 21 September 2024 and ran to 1 October 2024, and the private launch followed on 5 October 2024. EdgeProp named Meyer Blue Top Luxury Development in its Excellence Awards 2025, and in April 2026 a further release of four-bedroom premium homes was made, according to UOL’s results presentation for the first half of 2026.
| Date | Step at Meyer Blue |
|---|---|
| Feb 2023 | Freehold Meyer Park site acquired en bloc (EdgeProp, 9 February 2023) |
| 13 Aug 2024 | Building plans approved (developer’s site plan) |
| 2 Sep 2024 | Factsheet issued with the unit mix of 226 homes |
| 21 Sep to 1 Oct 2024 | Private previews |
| 5 Oct 2024 | Private launch |
| 23 Oct 2025 | Top Luxury Development, EdgeProp Excellence Awards 2025 |
| Apr 2026 | Further release of four-bedroom premium homes (UOL) |
| 31 Dec 2028 | Expected notice of vacant possession |
| 31 Dec 2031 | Expected legal completion |
Sources: the developer’s factsheet, e-brochure and site plan; UOL Group; EdgeProp. Expected dates are the developer’s; the sale and purchase agreement governs.
What Is Confirmed for Meyer Blue So Far
Several particulars are already fixed in the developer’s documents. The address is 83 Meyer Road, Singapore 437910, with the management office at 81 Meyer Road. The site is Lot 04029P of Mukim 25, held as an estate in fee simple, which is freehold, and measures about 8,981.1 square metres with a permissible gross plot ratio of 2.8. The development is one block of 26-storey apartments with 226 homes, a basement car park, a swimming pool and communal facilities. Nine homes share each typical floor, in stacks 01 to 09, and the 26th storey holds the two penthouses and The Meyer Club. The basement holds 229 car park lots.
Transport does not wait for completion. Katong Park station on the Thomson-East Coast Line, about 510 metres from the site to Exit 1 in a straight line, opened on 23 June 2024, according to the Land Transport Authority, so the line is already running while the tower is built.
Who Is Building Meyer Blue
The developer is United Venture Development (Meyer) Pte. Ltd., holder of housing developer’s licence C1488, a joint venture of UOL Group Limited and Singapore Land Group Limited. Unison Construction is the main contractor, P&T Consultants the architect and ThreeSixty Cost Management the quantity surveyor. The landscape architect is Henning Larsen, and the interiors are by Peter Tay Studio and Index Design. The finished building will be one tower of 26 storeys over a single basement car park.
The developer page introduces both partners and the design team in more detail.
Meyer Blue Construction Stages and the Instalments
Because the homes are sold under construction, the price is paid in instalments that follow the building works, as fixed by the Housing Developers Rules. After the booking fee and the instalment at the sale and purchase agreement, payments fall due as the foundation, the reinforced concrete framework, the partition walls, the roofing and ceiling, the doors, windows, wiring and plumbing, and the car park, roads and drains are completed.
The two final instalments are tied to completion: 25% at the Temporary Occupation Permit and 15% at the Certificate of Statutory Completion. For a home booked after some stages have been certified, the instalments already due are paid on the timetable in its sale and purchase agreement, which usually means a larger sum at the start.
Following Meyer Blue to Completion
The latest updates page keeps a dated record of each step and lists what comes next: updated counts on the balance units chart as sales continue, new caveats on the recent transactions page, construction milestones under the payment scheme on the way to vacant possession, and any statutory change to stamp duty or loan limits. The payment scheme page sets out every stage with its percentage, and the project details page carries the developer’s particulars with their sources. Showflat viewings are arranged by appointment through the Sales Concierge.
This article is general information as at the date shown and is not financial, legal or tax advice. Particulars of Meyer Blue are from the developer’s factsheet, e-brochure and plans, statutory figures are as set out on this site’s financing pages, and distances are straight-line measurements on OneMap or the developer’s own travel estimates. Sources: the developer’s factsheet, e-brochure and site plan, UOL Group and EdgeProp, as set out on this site’s latest updates, project details and payment scheme pages.